Urban Extension Road (UER) II is proposed as a part of Delhi’s 3rd Ring Road connecting all major national highways NH1, NH10, NH8 & NH2. Package 1 starts from NH-1 and extends till Rohini region with total length of 15km.
The project features multiple underpasses, 2 nos. Elevated viaducts, 1 nos. ROB, Elevated ramps for exit roads & U turn along with U turn underpasses & multiple ramps at NH-1 Junction. In total, project features individual elevated structures of approx. 11km length.
To cater for sharp curvatures, multiple variation in spans and deck widths, Pretensioned I girders of constant cross section is proposed for all elevated structures. In total, approx. 1300 nos Pretensioned I girders are used in complete project. Total length of Piles adds up to approx. 47km.