The Kundalika Creek Bridge is a flagship project under the Revas–Reddi Coastal Highway (SH Special No. 5), undertaken by the Maharashtra State Road Development Corporation Ltd (MSRDC). This four-lane bridge, including approaches, will connect Revdanda (Alibag Taluka) and Salav (Murud Taluka) in Raigad District, enhancing coastal connectivity and reducing travel time along the Arabian Sea corridor.
The structure is designed for a driving speed of 80 kmph, with footpaths on both sides and provisions for utilities, decorative lighting, and inspection galleries. The project is executed under EPC mode, with a Defect Liability Period of 120 months and maintenance for 60 months.